family patient hospital room northern beaches health hub

Construction is set to start late 2020 with completion shortly thereafter.

Ground: 40sqm
Level 1: 488sqm
Level 2: 488sqm
Level 3: 488sqm
Level 4: 488sqm

Walk door to door to the new $2.4b Northern Beaches Hospital in under 10 minutes – less than any other comparable space for lease, or drive in less than 2 minutes

Floor Plans

The floor plans below are indicative only. The finished product will depend on individual tenancies, spaces and their requirements.

Example Floor Plans
medical precinct floor plan split tenancy example
In this example Tenant 1 and 2 enjoy virtually open plan spaces unencumbered by any core services, which are ‘outboard’ of the ‘tenancy area proper’ in the shared services spine. In this example both tenancies do not need further amenities than what is provided as shared, therefore the tenancy layouts can be can be maximized with clinical, ‘billable’ functions (Consults, treat spaces, plus admin etc.)
Estimated Construction Completion

Construction is set to start late 2020 with completion shortly thereafter.

Spaces Available

Ground: 40sqm
Level 1: 488sqm
Level 2: 488sqm

Level 3: 488sqm
Level 4: 488sqm

Ideally Located
Walk door to door to the new $2.4b Northern Beaches Hospital in under 10 minutes – less than any other comparable space for lease, or drive in less than 2 minutes.